Pages

Showing posts with label knitting. Show all posts
Showing posts with label knitting. Show all posts

Friday, September 18, 2009

Rockin the Knitting

A couple weeks ago I ordered this kit from Knit Picks. I started my first ornament yesterday and finished it today. It's so darn cute! This is my gift tag plan for this year. I'm certain I have more than enough time to finish them.

Crackberry shown to give you and idea of size.

Thursday, September 17, 2009

Tabi Socks Done!

Last night, or early this morning I finished the toe of the second Tabi sock for SD. It's a Christmas gift I started last year (way to late) and am proud to say I have completed them for Christmas this year.

The photo below is my feet in the socks. They are super silly looking but I didn't have any great flip flops to put on over them. For a better photo check here. The pattern came from the Not Just More Socks book by Sandi Rosner. I used Imagination yarn in the Wicked Witch colorway (Evil Stepmother wasn't as pretty).

This was the first time I attempted the Kitchener Stitch and is so very cool I want to do it all the time! The yarn is hand wash so I hope my SD will remember that. They are so soft I want a pair now!


Being frugal means planning for Christmas in August my friends.

Saturday, August 8, 2009

Lady E is finished!

Last night I was in the knitting mood and pulled out my Lady E entrlac shawl I started in October of 07. Its so funny that I finished it last night because it only needed two more rows and has been sitting on the needles like that for several months.

I'm glad I finished it before the weather starts to turn so I can wear it all winter long. Although my office is air conditioned really well so I think I will be able to use it now.

It's longer than the pattern because I wanted it to be. I'm still on the fence about adding fringe. I need to measure the yarn I have left and see if I even have enough to do it. I need to block it still too.

Tuesday, December 30, 2008

December Wrap Up

December was not as challenging even with Christmas. Our employer income stayed the same. Additional income of $775.40 in the form of...
  • $269.40 - the hubs bonus (after taxes)
  • $220.00 - health reimbursement from my company
  • $286.00 - cash out stock that was no longer publicly traded ($230 went to savings)
We have decided to take the $1000 we have in a CD that matures next month and put it in savings. Then combined with our tax return we should have enough to have the work that was done on my Subaru last spring done AGAIN cause they messed it up. We are hoping the new mechanic finds fault with the work so we can get reimbursed. That's a long story for another day. Anything left over will immediately go on debt.

We went over our Christmas budget by $15 but that is not too bad since we bought gifts for many people on $500 by shopping sales and making some hand crafted items. We also cut back a little this year but didn't everyone? More hand crafted items are in store that were not finished but I have learned to start early next year.

As far as monthly expenses we track such as groceries, gas, eating out and coffee.
  • Grocery budget $400 - actual $492.20 and we still need stuff for New Years Eve
  • Gas budget $140 - actual $125.56 (and my tank is FULL)
  • Eating out $136.12 which is $3.05 more than last month
  • Coffee $96.59 which is $15.32 less than last month
Goals for January...

Finances
  • Reduce debt by $1800 ($1095 on credit cards and $705 on loans)
  • Reduce eating out to $50 (date night with the hubs)
  • Reduce coffee to $50 (twice per week)
  • Increase grocery budget to $500
Health
  • Continue walking on Sunday mornings with my friend
  • Add elliptical machine twice per week
  • Add The Firm video once per week
  • Increase water intake
  • Date night with the hubs (see eating out)
Hand crafting
  • Finish SD tabi socks
  • Finish SS fingerless gloves
  • Sew headband
Decluttering and Condo projects
  • Put away pattern pieces found in storage tub
  • Find homes or donate stuff behind the couch
  • Find homes or donate stuff along wall in master bedroom
  • Donate items already bagged
And there you have it. I think these are all attainable and I like the focus on several areas in my life. Here's to 2009!

Wednesday, December 24, 2008

It's snowing again

I am happy to report that I finished my brothers Christmas gift last night. I still have a few thousand threads to snip then I will get it in to a box and wrap it. I'm calling it Tetris for obvious reasons. Oh - and it's HUGE!

I'm pretty thrilled with the randomness of the look of the quilt but there is nothing random about the pattern. Where you see the orange squares is where I stitched an X through the front and back with orange thread to "quilt" them together. The backing became the binding on the front. It's in the dryer right now cause it's all snowy from the photo.


Here is a special treat for you all. Someone gave me this recipe last year and it replicates a certain giant coffee sellers Christmassy treat with cranberry's and white chocolate.

1 ½ cups packed light brown sugar

1 cup unsalted butter, melted and cooled

2 eggs

2 teaspoons vanilla extract

2 ¼ cups all-purpose flour

1 teaspoon baking powder

1 teaspoon salt

1 ¾ cups white chocolate chips

1 ½ cups dried cranberries, coarsely chopped (I use Craisins)

1 cup toasted chopped pecans (if desired)

¼ cup grated orange zest


Preheat the oven to 350°


Lightly butter an 11 by 15 inch jelly roll pan or rimmed baking sheet. Whisk together the brown sugar, butter, eggs, and vanilla in a large bowl until smooth. Whisk in the flour, baking powder, and salt until well blended, then stir in the white chocolate ships, cranberries, pecans, and orange zest. Spread the mixture evenly in the prepared pan (it will be quite stiff) and bake until golden brown, about 20 to 22 minutes. Set aside on a wire rack to cool.


Frosting


8 ounces cream cheese, at room temperature

1 cup powdered sugar

½ cup unsalted butter, at room temperature

3 tablespoons grated orange zest, divided

2 teaspoons vanilla extract

1/3 cup dried cranberries coarsely chopped

6 ounces high quality white chocolate, coarsely chopped

Cream together the cream cheese, powdered sugar, butter, 1 tablespoon of the orange zest, and vanilla with an electric mixer at medium speed until smooth and fluffy. Spread the mixture over the cooled base. Stir together the remaining 2 tablespoons orange zest with the dried cranberries in a small bowl and sprinkle the mixture over the frosting. Melt the white chocolate in a small heatproof bowl set over a pan of simmering water, stirring until smooth. Drizzle the white chocolate over the bars and let sit until the chocolate is set.

Cut the bars into 3 inch squares and then diagonally into triangles, makes 48 bars.



I was unable to finish the Tabi socks for my SD, the fingerless gloves for my SS or the scarf for my mom. Never fear, the SK's will get their gifts in January some time and I will finish the scarf and give it to my mom or save it. It's never to early to start for next year!


Below is a shot of the first Tabi sock and a skein of yarn. I'm about to turn the heel on this sock. This color way is called Wicked Witch. I was leaning towards Lost Boys cause I thought Evil Stepmother was over the top. I will post a photo when they are done.



This is the first ever white Christmas for me and I am thrilled! Now it's time to get my house back in order. There is sewing and wrapping stuff everywhere. I may just make myself a new pair of flannel PJ bottoms first.

Happy WHITE Christmas!

Sunday, December 7, 2008

Hand Crafting Update

After spending quite a bit of time yesterday locating the top of my dining room table I was able to make the hubs one of his gifts as he was out with the guys. Sorry no photos cause he reads my blog but I will post one after Christmas. SD and I watched girlie movies, made dinner and I did some sewing.

Today aside from picking up our tree and decorating it and the house and making cookies I plan on devoting all my sewing time to my brothers quilt top. My goal is to finish the top by Tuesday of this week at the latest. Then I will need to get fabric to back it (maybe a middle layer too) at some point, tack it down in several places (a nontraditional way of quilting it) and binding the edges. Then that gift will be done.

I started two knitting projects. These fingerless gloves for SS which I have now ripped out three times. I have made similar gloves with cables with no problems but these are just really stressing me out and I'm not certain why.

I am also making a scarf for my mom with extra yarn I bought for my wrap. I am using the same pattern but making it only three squares wide. I was knitting on that at lunch last Thursday and somehow screwed it up. I am going to try and fix without ripping it all the way out.

I ordered this yarn in the "Wicked Witch" colorway for SD's tabi socks on Friday. I hope it comes really quickly so I can knit those socks up.

With two and a half weeks until Christmas I better get my but in gear!

Sunday, November 30, 2008

November Wrap Up & December Goals

November was a challenge with Christmas coming up, gifts to buy or make and tabs and emissions for my car. I took the hand crafted challenge and so far have purchased one ready made gift.

As far as income goes we maintained our employer income, had no other income and our assets fell by $414.44 due to the economy. Planned meals out this month were one and we went WAY over that. We spent more on coffee but it was a lower percentage of our fun money expense. The Landmark Forum will be placed on hold for now.

The real bummer was not being able to get the home equity loan not because we didn't qualify but because of the lower value of our condo. I updated our networth badge and compromised with the value as listed by Zillow. We also made the tough decision to temporarily stop our 401(k) contributions so we could have extra money per month to pay on our debt.

My no spend days goal for the month originally was 12. Then I changed it to 6 and had 4. I bought a few Christmas decorations with fun money but am trying really hard to decorate with what I have or find an inexpensive alternative. Been getting inspiration from this great site called JunkMarket. The stocking for my niece, flannel PJ's for my nephew and the flannel PJ bottom's for my SK's are the only handcrafted items I finished this month.

Groceries spent $451.06 which was a reduction over last month but still 12% over budget. I spent $394.77 on fun money which was an increase over last month and 3% over budget. Eating out $133.07, coffee $111.91, entertainment $42 and crafts $31.61. All increases over last month. My budget for gifts this month was $250 and I spent $174.57 $26.67 of which was non hand crafted.

Goal was minimum payments on the credit cards ($235) and loans ($705) as there was no extra money in the budget for more than that due to Christmas gifts, Thanksgiving and my dad's birthday.

Total debt balance fell to $37, 684.50 which is 66% of available credit. Credit card balances total $ 10,525.95 and loan balances total $27,158.55.

Goals for December

Complete all hand crafted and buy all store bought Christmas gifts by December 22nd.
  • Flannel quilt & premade vegan dinner for brother
  • Fingerless gloves for SS
  • Tabi socks for SD
  • Scarf for mom
  • ??? for dad
  • ??? for sister & bil (already bought them one thing)
  • ??? for nephew (already made flannel PJ's)
  • ??? for niece (already made Christmas stocking)
  • XXX & XXX for the hubs (he reads this blog so I can't say here - sorry honey)
Have 6 no spend days
Walk 4 times
Work out 8 times
Maintian EI and not worry about OI for this month

Sunday, November 9, 2008

Where is Lady E?

My last post regarding Lady E I had run out of yarn and still had ten tiers (twenty rows) to go plus the end row of half triangles and fringe.

On the first weekend of September I went down to my LYS (local yarn shop) to pick up three more skeins of my Noro Kuryon. They were out of my colorway and said they would order some for me.

It still has not come in yet. I'm getting antsy to finish it since the weather is so cruddy now.

I am headed to the LYS today to hopefuly pick up more to work on my wrap but also need a skein of funky self striping yarn to make these (photo of book cover is item) Tabi socks for SD for Christmas.

*****Update - just got back from LYS and they still don't have my yarn! Apparently this kind of yarn takes a while to get. I wish I would have known that. Still would not have prevented me from ordering more but I would be more prepared to wait it out.

Didn't find anything I liked for SD's Tabi socks so will look on Knit Picks.

As for the rest of the day. I'm going to turn thrift store sweaters in to Christmas stockings! Hope to update with photos tomorrow!

Friday, November 7, 2008

Christmas On A Budget

After the depressing news from Wednesday. I am determined to not only make a dent in our credit card debt but also celebrate Christmas as best I can.

I went through the budget for the month. After all of our bills and minimum payments on the credit cards and loans, food, gas money and additional expenses I came up with $250 for Christmas gifts or supplies to make gifts and $200 extra to put on our debt. There is a little wiggle room in a few areas but all in all I feel pretty darn good about it.


Any money I don't spend from a bucket of budgeted money I will snowflake which will go towards debt. So far I have snowflaked $7 as my gas budget for the week was $35. We filled up this morning and it was $28 (God bless $2.29 a gallon!). Since the hubs and I carpool we only have to fill up one car a week and his car occasionally as we use it on the weekends.

I have resorted to being completely domestic. My gifts this year will be mainly hand crafted or of the baked variety. On the rare occasion I need to purchase a gift I will do my best to be frugal and thoughtful at the same time.



Between knitting, sewing and baking I have gifts in mind for most family members. Check back throughout the month to see my photos of what I make. If you want to join the handcrafted revolution just click on the badge at the top right of my blog or click here.

Monday, July 21, 2008

Pink Baby Bootie

I so LOVE these baby booties! From now on any time a friend or family member is preggers I will be making these for them. So very easy and so very cute!



I pretty much completed this half of a pair waiting for the movie to start Saturday night. We got to the drive in at 6:30 (movie didn't start until almost 10:00) cause we were not certain what the line for Dark Knight would be like. Glad we got there when we did. We were only four cars back from the front of the line and it was getting longer by the minute! The movie was pretty good. I slept through Wall-E cause it was so late.


Anyway, this set of booties is for a gal who works at the Starbucks my friend Mindy and I go to every Sunday after our walk. Nicole just had a baby girl who is a week old. The gals at Starbucks are total sweethearts! I should be able to get the other bootie done in plenty of time for next Sunday's walk.

Friday, July 18, 2008

Firehouse Glove Update

After not working on these gloves since I started them in March I decided to pick them up last night. I had forgotten how many rows I had already done in the palm area. I made my best guess as to where I had left off and completed the increase rows under the thumb. You can kind of see in the photo below where my thumb is and the waste yarn knotted below to hold the stitches for the thumb.

Below is a detail of the "cuff" for my gloves. There will be four buttons holding it together (the grey will button over the red). These gloves are kind of a modern take on an old fashion woman's glove.

I have actually completed the pinky and part of the ring finger since this photo was taken last night. A far cry from photos of the last time I posted about these lovelies. If you click here you can view my previous post from March and from there you can click on the link to knitpicks where I found the yarn and pattern plus see a photo of the finished product.

I noticed that the finished gloves are exactly the same stripe-wise on each of the fingers. I am not too worried about that. In fact, I am going to embrace the miss matched stripes I am certain to encounter on my gloves. I think I prefer it that way too.
Kind of like the "common myth which has developed that all Amish quilts contain a deliberate flaw because to make something perfect would be to challenge God".

These Firehouse Gloves (named after the yarn) will be perfect this coming winter!

Saturday, July 5, 2008

Knitting for Babies is Fun!

Thursday I had some time to kill between getting off early for the holiday weekend and picking up hubby from work. We carpool and he had to stay until five. I stopped in at the Hilltop Yarn shop and picked up some yummy stuff to make these booties (if you scroll down the page a bit on the right you can click to get a PDF of the free pattern) for a friends baby boy due in September.


The blue I chose looks a lot more green in the above photo. My friend really liked them and they were super simple and quick to knit up. I started them around 4 o'clock Thursday afternoon and by 3 o'clock the next day I was sewing on the buttons (that was not non-stop knitting mind you).

I have started a second pair for my sister as she is due in the beginning of August. She won't tell me the baby's sex but I suspect a boy. If it's a girl I will have to make her pink ones and give the second set I started to my friend as well.

Sunday, March 9, 2008

My Fingers Are Cold

I needed a break from Lady E. I am still plowing away at her a couple tiers at a time but really needed some variety in my knitting. Also, I wanted a quick project that would give me a little bit of challenge.

I saw these Button Gloves on the cover of the Knit Picks catalogue a couple months ago and NEEDED to make them. The pattern is in the book Not Just More Socks by Sandi Rosner. My Knit Picks order arrived earlier this week and I cast on right away. I'm using Felici Superwash (Merino and Nylon) self-striping yarn in the Firefighter colorway. It's super soft and I can't wait to try these babies on!


Below is a detail of what I have done so far. The photo isn't great but you start with about an inch of seed stitch and then stockinet. The seed stitch is on the edging at the cuff and also the band where you button up the gloves at the wrist.

Wednesday, September 26, 2007

Has this ever happened to you?

I carpool with my hubby and three days a week he works an hour later. I amuse myself in the car with knitting or reading. As it happens yesterday I was intense on finishing this sock so I could wear them today. Darn if I didn't break the needle of these DPN's.

I bought the needles last summer to knit my first pair of socks on. Admittedly I'm not completely distraught as I really wanted new ones and now I can get them.

I tried knitting with them and it's working so far. I had already turned the heel and am in the home stretch at least.



Friday, August 24, 2007

Actual Knitting Project


So, I started this blog to share actual knitting projects and finally I am able to post some photos. I am pretty new to knitting. I started last fall but have been sewing and doing other crafts for over 20 years and have been wanting to learn to knit. I bought this yarn with birthday money at my favorite knitting shop the village yarn and tea shop. At the moment I can't find the label but it's from Italy. I also bought some in a dark olive almost hunter green. They had awesome colors and I wanted to buy a ton. I thought I would need not quite two skeins per pair of socks but was wrong. I am hoping I can exchange two so I can get eggplant and mustard.

Wednesday, August 1, 2007

Obsessed

OK, so I found a pattern I absolutely have to make. I came across this lovely example of the Lady Eleanor on Jen's blog. I am going to order yarn on line and can't wait to start it.

Now, being a novice knitter but a pretty expert sewer I feel pretty confident I can jump in to this pattern without too many misshaps as long as I go slow and pay attention to what I am doing. Wish me luck!